Roof Replacement Process: What to Expect

You got the roof inspection and it was determined that your roof needed replacing. Now the numbers have been agreed upon, contracts are signed, and you are officially on the schedule.

So what happens next? Here is a look at how a roof replacement typically goes for Kansas City homeowners, from the days before your crew arrives to the final walkthrough.

A Few Days Before Installation Day

  • A dumpster might be delivered to your home one to two days before the roof replacement starts.
  • The new shingles will arrive a few days before the start of the project. They may be placed on your roof or in your driveway.
  • We will confirm your start date and keep an eye on the forecast. If rain or high wind is coming, we will reach out to move the date rather than leave your home open to the weather.

Getting Your Home Ready

  • If you have pets, talk with your project manager about keeping them inside or away from the work area during installation.
  • Move patio furniture, grills and garden decor such as statues and planters away from the house.
  • Make sure gates are left open for the crew, or ask that they close the gates behind them at all times.
  • Move cars out of the garage and driveway so materials and the dumpster can be reached easily.
  • If you have special requests, let the person in charge know about them in advance.

What Happens on Installation Day

Our crew arrives early and starts by protecting your landscaping and the sides of your home with tarps. Next, we tear off the old shingles and underlayment down to the roof decking. With the decking exposed, we inspect it for soft spots, rot and water damage. If boards need to be replaced, we show you photos and explain the cost before we do the work.

Once the decking is sound, we install new underlayment, ice and water protection along the eaves and valleys, drip edge and new flashing around chimneys, walls and vents. Then the new shingles go on, followed by the ridge cap and ventilation. Expect some noise while the old roof comes off. Most homes are finished in one to two days, depending on the size of the roof, its pitch and the weather.

Staying Home During the Work

You do not need to leave home during your roof replacement. Inside, you may hear hammering and feel some vibration, so take down pictures and mirrors on the top floor and cover anything stored in the attic to keep dust off it. If someone in your home works nights or has a newborn, tell us ahead of time and we will plan the start time around it where we can.

Final Day and Cleanup

  • The crew removes the old shingles and any leftover materials, trash and supplies.
  • We run magnetic sweepers across your yard and driveway to pick up loose nails, then do a final walk to catch any debris we missed.

After Your New Roof Has Been Installed

  • Your project manager will set up a time to walk the finished roof with you, answer questions and collect the final payment.
  • If your roof qualifies for a manufacturer warranty, we register it for you and give you the paperwork for your records.

Questions about cost before you get started? Read our guide to roof replacement cost in Kansas City, or ask about financing from $99 to $129 per month, with approved credit (W.A.C.).

Related reading: How to Choose a Roofing Contractor: 9 Tips and Siding Cost Guide: How Not to Overpay.